Aerial Photo Database
Fulltext
  • Fulltext
  • Place

Search for place, image id, term(s)

Only search for place

Aerial image 582282
Construction site for new construction on the motorway route of the motorway A26 exit in the district Eilendorf in Buxtehude in the state of Lower Saxony, Germany

BUXTEHUDE 22.09.2022

Buxtehude from above - Construction site for new construction on the motorway route of the motorway A26 exit in the district Eilendorf in Buxtehude in the state of Lower Saxony, Germany
Thematically related aerial photos
https://www.aerialphotosearch.com/info/aerial-photos/construction-site-for-new-construction-motorway-route-motorway-exit-district-eilendorf-buxtehude-state-lower-saxony-germany-582282.html https://www.aerialphotosearch.com/info/aerial-photos/construction-site-for-new-construction-motorway-route-motorway-exit-district-eilendorf-buxtehude-state-lower-saxony-germany-582282.html

Construction site for new construction on the motorway route of the motorway A26 exit in the district Eilendorf in Buxtehude in the state of Lower Saxony, Germany. Further information at: Autobahn GmbH des Bundes Niederlassung Nord. www.autobahn.de Photo: Martin Elsen

Aerial image ID: 582282
Image resolution: 7458 x 4972 pixels x 24 bit
compressed image file size: 30,94 MB
Image file size: 106,09 MB
Sources and credit: © euroluftbild.de/Martin Elsen

The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal