Aerial photograph 701789
Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW, in Minfeld, Rhineland-Palatinate. This photo shows the demolition and dismantling of the four older turbines
MINFELD 29.05.2026
Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW, in Minfeld, Rhineland-Palatinate. This photo shows the demolition and dismantling of the four older turbines. Further information at: JUWI AG. www.windpark.juwi.de / www.juwi.de Photo: Werner Riehm
Aerial image ID: 701789
Image resolution: 5501 x 3607 pixels x 24 bit
compressed image file size: 7,83 MB
Image file size: 56,77 MB
Sources and credit: © euroluftbild.de/Werner Riehm
This press photo represents a non-binding information offer, which is subject to media and press privilege under Art. 85 GDPR and Art. 5 GG. Please send us your corrections and any objections via grahn@euroluftbild.de or contact us by phone at +49 30 42161720.
Position: 49° 4' 49.97'' N / 8° 9' 24.9'' E